Solution

Get more out of the lines we already have.

Advanced transmission technologies (ATTs) are proven upgrades that move more power through the lines Texas already has. They can be installed in only just a few months.

Right now, our lines are jammed.

Texas set a new record for power demand in July 2026, and our busiest lines are running near their limits. Beside not being able to get enough power where its needed, congestion cost about $2.5 billion a year.

Upgrade the lines, and run them smarter.

Grid-enhancing technologies (GETs) are sensors and software that show how much power a line can safely carry right now, and help route power around bottlenecks. High-performance conductors replace old wire on the same towers and can carry about twice as much. Both go in faster and cost less than new lines, and they work alongside new lines, not instead of them.

the capacity on existing lines
Up to 2×
lower congestion costs
25–50%
to put in place
1–3 yrs

Get more from the lines Texans already paid for.

Sign up and be a part of the solution.